SECOND QUARTER REVIEW AND ANALYSIS
DEPARTMENT OF PUBLIC WORKS
CITY OF SALISBURY, MARYLAND
1. PRINCIPAL FUNCTIONS (See First Quarter R & A)
2. ANNUAL OPERATIONS (See First Quarter R & A)
3. F.Y. 2004 GOALS (See First Quarter R & A)
4. PROBLEMS AND CORRECTIVE ACTIONS
A. Industrial Discharges and Pretreatment Program
1. Grease accumulations are seen in nearly all the City's pump station wet wells. WWTP personnel continue to clean these stations on a regular schedule with the Vactor truck. The waste is taken to the Septage Receiving Building for Lime stabilization and storage. The treated waste is subsurface injected to agricultural land with the sludge applicator for disposal. The Pretreatment Program continues to monitor dischargers and enforce the regulations to reduce the amount of grease accumulations.
2. Occasional violations of the Silver limit occurred during the 2nd quarter FY '04. Inspections and samples are ongoing as part of the Silver Pretreatment Program
3. Sharp Water has agreed to move their facility. The City is awaiting their plan for the move. Violations of Iron and Chlorides are ongoing.
4. Inspections of SIU's are ahead of schedule for calendar year 2004.
B. Wastewater Treatment Plant
1. Overall compliance for the months of October and November was 98.7%.*
2. Violations for October and November.*
October – 7 Silver and 1 TSS violations this month – 97.42%
November No permit violations this month – 100%
(* December data will not be available until 1/28/04)
C. Septage Handling Program
1. The Septage Facility is open and receiving septage.
2. The septage fee charged to septage haulers for the City to receive treat, store, and land apply residential septage generated within Wicomico County is currently set at $66/1,000 gallons. The fee for out-of-county is the same.
D. Biosolids Department
1. Hauled beltpress sludge to County Landfill
2. Performed maintenance of equipment.
3. Worked on beltpress relocation
4. Sludge hauled: Liquid Beltpress
October None 94.5 dry tons
November None None dry tons
December None None dry tons
Leachate hauled: October 60,000 gallons
(to City system) November 205,000 gallons
December 150,000 gallons
Days Storage: Working 11 days @ 18,000 gpd as of 1/16/04
Reserve 3 days @ 18,000 gpd
5. GENERAL FUND ACTIVITIES
A. Citywide Curb, Gutter and Sidewalk
Contract No. A-7-03: 86% Complete
Contract No. A-7-04: 79% Complete
B. Citywide Blacktop
Contract No. 9-02-BT - Blacktop - 91% Complete
Contract No. 9-03-BT - Blacktop - 60% Complete
Contract No. 9-04-BT - Blacktop - 63% Complete
C. Aerial Topographic Mapping
We have 160 ortho photos leaving 14 topo maps yet to be purchased via City funds.
D. Pavement Millings
Contract No. 8-02-PM - Extension - 100% Complete
Contract No. 8-04-PM - 85% Complete
6. SEWER FUND ACTIVITIES
A. Wastewater Treatment Plant Improvements per Federal/State Grant and State Loan
1. A Chemical Translator study will soon be completed which, from preliminary
results, will modify the WWTP NPDES Discharge Permit limit for Silver and Copper. The current limit for Silver is 1.8 ppb. The pending translator study results will set this limit at >6 ppb. This is a three fold increase, making compliance more feasible. The study establishes how much silver is actually available in the plant effluent, which could affect aquatic organisms.
2. The second phase of work on the Long Term Control Plan for control of
overflows is completed The work includes monitoring of sections of the collection system to determine the extent of any remaining combined sewers, infiltration, and inflow. The results of the study will be utilized to determine needed modifications and repairs.
3. Design of Phase I of the BNR Upgrade to the WWTP is underway, by O'brien
and Gere. Completion for several fast tracked items that are part of the upgrade is planned for this coming year. Overall completion of the upgrade is scheduled for 2007. The preliminary engineering report has been submitted to MDE.
7. WATER FUND ACTIVITIES
A. Installed security fences around the water towers and reservoirs.
B. Lead and copper testing has been completed and incompliance.
C. Clean-out for Edgemore and College Ave. elevated storage tanks completed as of July 2003.
D. Phase I - Scada System is 90% complete.
E. Electrical upgrade for the Park Water Plant is complete and fully functional.
8. STORMWATER MANAGEMENT
|
|
QUARTER |
|
|
|
|
|
1 |
2 |
3 |
4 |
|
C Plans Reviewed |
13 |
015 |
0 |
0 |
|
C Plans Approved |
4 |
08 |
0 |
0 |
|
C Waivers Granted |
0 |
04 |
0 |
0 |
|
C Inspections Performed |
6 |
025 |
0 |
0 |
9. PRELIMINARY DEVELOPMENT PROJECTS
Advanced Auto Parts (W. Ruark Dr. & Rt. 13 N.)
Aspen Hills Village (Dykes Rd.)
Avalon Plaza
Briancliff Estates (Dykes Rd.)
Car Care, Rt. 13 North (Rt. 13 & Alexander Ave.)
Cedar Crossing (Onley Rd.)
Culver, Robert (Culver Rd. & Pemberton Dr.)
Executive Plaza, Lot 2 (Executive Plaza)
Fire Station 1 Addition – Beaglin Park
First Baptist Church (Booth St.)
Fountains, Lot 5, Medical Building (Leonard Lane)
Fountains, Lot 9A (Sweetbay Dr.)
Freida Potts Property (Rt. 50 W.)
Go-getters (Calloway St.)
Go-getters Senior Housing (Callaway St.)
Healthway Dr., Senior Housing (Healthway Dr.)
Heritage (Pemberton Dr., Culver Rd.)
Heritage, Parcel E (Pemberton Dr.)
Kentucky Fried Chicken (S. Salisbury Blvd.)
Layton, Donald (E. Naylor Mill Rd.)
Lord Salisbury Shopping Center (N. Salisbury Blvd.)
McDonald’s (S. Salisbury Blvd.)
Merritt Mill Rd. Apts (Merrit Mill Rd.)
Miller’s Edge (Pemberton Dr.)
Mt. Hermon Rd. 1005 (Mt. Hermon Rd.)
N. Salisbury Shoppes (N. Salisbury Blvd.)
Newtown Park (Broad St., Poplar Hill Ave., Ellen St.)
Rayner Development (Pemberton Dr.)
Rent-a-man (Northwood & W. Gordy Rd.)
Robertson Farm (Old Ocean City Rd., Sharen Dr.)
Sassafras, Offsite W&S – (West Rd. Offsite)Salisbury
Mall Renovation - (Civic Ave. & Glen Ave.)
Salisbury Seniors Cottages (Foxfield Apts.) - (W Zion Rd.)
Shady Grove (Dykes Rd.)
Three Creeks (W. Naylor Mill Rd.)
Tim Mar Acres
University Park - Phase II (Milford St.)
Zion, North Rd. Hotel – (W.Zion Rd. & Kiley Dr.)
Waterside Landing (Canal Park Dr.)
Waterside Landing (Canal Park Dr.)
Westwood Commerce Park (West Rd.)
Wicomico Transit - E. S. Adkins Site (Rt. 13 N.)
Williams Landing (Riverside Dr.)
Woodcock Property (Hammond and Caroline St.)
10. SPECIAL PROJECTS
ØConstruction inspection of WWTP improvements (in-house vs. outside contractor to be
determined)
ØCulver Road - drainage design - Concept Design Completed
ØDPW and Planning & Zoning coordination of development and subdivision requirements
ØTopographic digitized mapping
ØPretreatment program ongoing
ØSludge management applications/permits ongoing
ØTraffic sign upgrading per MSHA grant
ØEvaluation of odor control, BOD removal and sludge disposal methods to be completed
with BNR upgrade (construction completion scheduled for 2007)
ØEvaluation of WWTP process capacity to be completed with the BNR upgrade
(construction completion scheduled for 2007)
ØFinal design for WWTP BNR upgrade and expansion is underway including a solids
handling study to develop an alternative approach for sludge - dewatering and sludge stabilization facilities to eliminate the need for existing sludge-storage lagoons and sludge-thickness tanks and improve sludge-disposal options and flexibility.
11. PRELIMINARY SUBDIVISION/RESUBDIVISION/EASEMENT PLATS
Aspen Hills - Subdivision (Dykes Rd.)
Atlantic Bank & Donald Williams - Subdivision (Riverside Dr.)
Avalon Retirement Phase 15 - Subdivision (Troopers Way)
Cottages @ Riverhouse - Easement (Pemberton Dr.)
Emerson Ave., Parcel 2597 - Subdivision (Emerson Ave.)
Fountains Lots 1,2,3,9, & 10 - Resubdivision (Merritt Mill Rd.)
Fountains, The - Subdivision (Merrit Mill Rd.)
Foxfield Apt. , Lots 76 & 77 - Resubdivision (Harford Rd.)
Heritage - Subdivison (Pemberton Dr. & Culver Rd.)
Jackson St., Donald Hall Subdivision (Jackson St. & Roger St.
Leonards Mill Property, Lots 1A & 1B - Subdivision (W. Dagsboro Rd.)
Marley Manor, Verizon Easement – Robins & Snow Hill Rd.
Monument Square- Resubdivision (Monument Square)
Mill Pond Village Lots 4 & 5 (E. Naylor Mill Rd.)
Natsen & Snitzer - Subdivision (S. Divison & May Dr.)
Pepsi Expansion - Resubdivision (Snow Hill Rd.)
Raynor Development - Subdivision (Pemberton Dr.)
Rector Property - Easement (Honeysuckle Dr. & Varsity Lane)
Rector Property - Subdivision (Honeysuckle Dr. & Varsity Lane)
Rich-Wil Drive, Beach, Anne D. - Resubdivision (Lot 9A & 10A)
Riverside Rd., Lot A, Phase 4 - Resubdivision/Easement (Riverside Dr.)
Salisbury Investment Group,LLC – Subdivision – Rt. 13 and Jasmine Drive
Sapan, LLC – Subdivision – Rt. 13 nr. Toys-R-Us
Shady Grove - Resubdivision (Dykes Rd.)
South Commons - Easement (Dykes Rd.)
Southside Professional Center - Subdivision (Division St., South add Building)
Stonegate - PH IV, 2a, 3a, - Section 4 - Subdivision (Stonegate Dr.)
Stonegate Sec. 4, Block C, Lot 1 - Resubdivision (Stonegate Dr.)
Verizon – Subdivision – Subdivision – Calloway Street
Victory Gardens, Lots 1 & 2 - Subdivision (Dickerson Lane)
Villages of Sleepy Hollow – Easement – Pemberton Drive
Villages of Tony Tank, Lots 1 & 2 – Resubdivision (Village Oak Drive)
Woodcock, Lots #270-292 - Resub, (Caroline St.)
Woodcock Property – Easement (Caroline and Hammond St.
12. ANNEXATIONS
East Naylor Mill Road - Ruark Property
Schumaker Drive - Robertson, Shultz and Brittingham
U.S. Route 50 - Milford St. Associates
Three Creeks – Causey Property
Old Ocean City Rd. – Farlow Farm
Johnson Road – Johnson's Retreat
Glen Avenue – Stephens Property
Pemberton Drive – Martin & Ruark
Glen Avenue – Brown Property
Glen Avenue – East Fields Development
13. RIGHTS-OF-WAY AND EASEMENTS
New Subdivisions
Processing various deeds
Research in Land Records
14. LAND SURVEYS AND ACQUISITIONS
As-Built Surveys: Brewington Overlook - Water & Sewer
Gateway Village - Water & Sewer
Harbour Pointe - Water & Sewer
Jersey Road - County Park Water Extension
Mill Pond Village - Water, Sewer, and Stormwater
Northeast Collector - Water and Sewer
Stone Gate - Water, Sewer & Stormwater Management
Villages at Tony Tank Water & Sewer
Pepsi – Water & Sewer
Topo: Milford Street - Regional Storm drain Study
Lake Street - Sewer Relief
Park - West Entrance Playground
Surveys: Rt. 50 East to Stadium - Sewer & Water
Northeast Corridor - Right of Way Acquisition
15. MISCELLANEOUS - SURVEYOR
Review subdivision plats and site drawings
Provide cadastral information to the public
City-owned land inventory completed
Public relations - land information and annexations
Logging field book index on computer
16. DESIGN/CONSTRUCTION PROJECTS
East Naylor Mill Road - Street lighting 100% complete
Northeast Collector - McCrone has designed street and storm drainage, and water and
sewer from U.S. 50 to Old Ocean City Road. City has negotiated right of ways for
acquisitions within corporate limits. Right of way through Robertson Property has been
obtained via Council approval of Planned Development District for Robertson Property.
Construction is scheduled to begin in June 2004 and end in June 2005.
Citywide combined sewer separation - Engineering for development of the long-term
separation is underway.
17. TRAFFIC DIVISION
A. STP MAINT
1. Repaired underground cables.
2. Checked out report of live wires for Utilities Dept.
B. WATER PLANT MAINT.
1. Repaired Starter at Paleo
2. Reset Breaker at Well Pump House #1 twice. Breaker defective.
3. Replaced 250 Amp Breaker in #1 Well House.
4. Paleo- met with Choptank and Water Plank about emergency generator
and replacing bad cable.
5. Checked out Well House # 14 controls.
6. Repaired control wires for Well House # 14.
C. CITY YARD MAINT.
1. Carpenters Shop- wired disconnect for router
2. Main Office- Picked up material and started to replace thermostat.
3. Utility Yard- replaced security light
4. Helped carpenter repair gutters.
5. Administration Office- installed two receptacles, removed one receptacle,
replaced bulbs in ceiling light and exit lights.
6. Main Office- replaced thermostat.
7. Reset time clocks in Traffic building and Stock Room building.
8. Checked thermostat in Stock Room
D. MARINA MAINT.
1. Checked out fan in bathroom and ordered new blades.
2. Check pedestal at slip 97.
3. Checked out service to party boat
4. Repaired light in pedestal
E. ZOO MAINT.
1. Replaced box and receptacle on lift station
2. Replaced bulb in security light
3. Checked electric fence around bear cage.
4. Repaired light on food storage building.
5. Installed two (2) new electric fence units for the bear cage.
6. Checked out people counter
F. POLICE DEPT. MAINT.
1. Marine Rd Tower- connected grounds to ground rods with cad welds.
2. Installed receptacle for UPS
3. Replaced three way switch
4. Verified specs for Tower site electrical service installation
5. Replaced ballast in one light for Quartermaster’s office
G. FIRE DEPT. MAINT.
1. Station # 1- Checked out electric door
H. SHOP MAINT.
1. Installed new computer.
2. Replaced cord cap for Stock room bird noise maker
3. Made repairs to 50 amp 125/250 volt receptacle assembly – replace
receptacle
I. PARKING GARAGE MAINT.
J. STREETLIGHT MAINT.
1. C.8 Terrapin Ln.- replaced eye
2. C.8 Marvel Rd.- repaired lens frame and eye socket.
3. Trimmed tree limbs around head
4. C.10 Marvel Rd.- replaced eye
5. Roberts Street- installed service
6. Middleneck Dr.- called Miss Utility
7. North Pointe- Called Miss Utility
8. Repaired conduit at Lake St. Playground.
9. Repaired lights on Plaza
10. Repaired C.13 U.S. 13
11. Repaired C.6 Waverly Dr.
12. Repaired C.10 Division St.
13. Repaired C. 6 Circle Ave.
14. Repaired C. 3 Mitchell Rd.
15. Repaired C. 3 Mitchell Rd.
16. Repaired C. 7 Mitchell Rd.
17. Repaired C. 9 Mitchell Rd.
18. Repaired C. 5 Fairground Rd.- replaced eye, bulb and igniter
19. Repaired C. 4 Cypress- replaced bulb
20. Repaired C. 5 Mitchell Rd.- replaced fuses, fuse holders and eye
21. Repaired C.2 Emerson- replaced bulb
22. Repaired C.1 West Dagsboro Rd.
23. Repaired C.7 N. Pointe- replaced bulb
24. Repaired C. 2 Hampshire- replaced fuses and eye
25. Repaired Rt. 50 Monument- replaced bulb
26. Repaired Government parking lot- reset time clock.
27. Repaired Fire Training Center- replaced bulb
28. Repaired Riverwalk south side- replaced bulb
29. Repaired Riverwalk north side- reset time clock
30. Repaired Lot # 16- replaced bulb
31. Repaired Plaza- replaced 160 watt bulb
32. Repaired Lot# 15 - replaced security light bulb and lens
33. Repaired Lot # 1- replaced eye
34. Repaired Caravan Way- check power to street light service and called
Conectiv.
35. Repaired North Point - Damaged conduits.
36. Reset Time clocks - Zoo, Picnic Island, Sanitation Bays, Stock Room
37. Gathered feeder cable at Picnic Island and secured @ 12 ft up to the pole.
38. Repaired C12 Industrial Drive - eye
39. Repaired C.8 Terrapin Ln.- replaced eye
40. Repaired C.8 Marvel Rd.- repaired lens frame and eye socket. Trimmed
tree limbs around head
41. Repaired C.10 Marvel Rd.- replaced eye
42. Repaired Limrock Ct. C.2- replaced eye
43. Repaired C-1 Middle Neck - Knocked down. Made circuit safe and
removed pole and debris.
44. Repaired C-4 Hillcrest Ave. - Replaced Eye
45. Repaired C-6 Hillcrest Ave. - Replaced Eye
46. Reset time clock at Government Parking lot.
47. Roberts Street- installed service
48. Middleneck Dr.- called Miss Utility
49. North Pointe- Called Miss Utility
50. Park light by river- put in ballast kit
51. Repaired C-10 Eastern Shore Drive and Vine Street.
52. Repaired C.40 Beaglin Park Dr. – replaced street light pole, head, and repaired conduits
53. Repaired C.1 Middleneck
54. Repaired C. 32 Beaglin Park Dr. Repaired C-16 STP Replaced bulb
55. Repaired Light on Black Jack pole
56. Repaired C. 7 Moss Hill- replaced bulb
57. Repaired C.1 N. Park- replaced eye
58. Repaired C.8 ESD- replaced bulb
59. Repaired Village Oak Dr.- replaced ballast kit
60. Repaired C.8 Onley Rd.- replaced bulb
61. Repaired C.16 St. Albans- replaced bulb
62. Repaired C.10 St. Albans- replaced fuses and repaired wire
63. Repaired C.5 Tilghman- replaced bulb
64. C.1 Middleneck Dr.- Replaced foundation, pole and light. (again)
65. North Pointe Dr.- repaired underground conduit, pulled new wire made
connections.
66. Repaired C.8 Cottontail- replaced arm
67. Repaired C.8 Terrapin- replaced eye and bulb
68. Repaired C. 3 Kinsdale - replaced bulb
69. Repaired C. 7 ESD- replaced eye
K. SIGNAL MAINT. & INSTALLATIONS
1. Relamped traffic signals
2. Replaced bulb at Beaglin Park and Schumaker wait light.
3. College and Super Fresh- checked for correct times.
4. Snow Hill and Carroll - replaced bulb.
5. Repaired signal at Beaglin Pk. And N. Park.
6. Repaired signal at Beaglin Pk. And N. Park
7. Repaired S. Division and Milford- replaced bulb
8. Repaired Waverly and S. BLVD- replaced bulb
9. Repaired Shumaker and Beaglin- replaced bulb
10. Repaired Waverly and S. BLVD- replaced bulb
11. Repaired ESD and S. BLVD- replaced bulb
12. Repaired Carroll and Snow Hill- replaced bulb
13. Repaired Davis and E. Main signal pole knocked down.
14. Repaired conduit for flashing light circuit at Brown & Naylor Sts.
15. Repaired Replaced bulb- Beaglin and Glen
16. Repaired/Realign Light Head at Delaware & Isabella.
17. Repaired S. BLVD and ESD- reset conflict monitor
18. Repaired Moss Hill and E. Main- reset MMU
19. Replaced bulb on Delaware North bound- Red signal.
20. Replaced bulb on Isabella East bound. Bad interlock socket.
21. College and Camden- repaired control cabinet and replaced signal head
visor.
22. Snow Hill and Carroll- replaced bulb
23. Main and Long- straightened heads
24. Repaired signal at Long and E. Main- replaced bulb
25. Priscilla St.- unloaded new poles
26. Repaired Delaware and Isabella- repaired amber signal
27. Repaired College and Camden- reset MMU
28. Main St. and Snow Hill- refastened service conduit.
29. Beaglin Pk. And Schumaker- reset signal
L. SIGNS
|
Adams Av. |
Caravan Way |
Downing St. |
|
Alexander Av. |
Carrolton Av. |
E. College Av. |
|
Baker St. |
Carrolton St. |
E. Church St. |
|
Bateman St. |
Castlebar Dr. |
E. Lincoln Av. |
|
Bayshore Ct. |
Cherry St. |
E. Lincoln Av. |
|
Benny St. |
Church St. |
E. Lincoln Av. |
|
Benny St. |
Clay St. |
E. Locust St. |
|
Brown St. |
College Av. |
E. Main St. |
|
Bryn Mawr Dr. |
Cottontail Dr. |
E. Main St. |
|
Canal Park Dr. |
Davis St. |
Edgewater Dr. |
|
Canal Park Dr. |
Decatur Av. |
Elmwood St. |
|
Canal Park Dr. |
Division St. |
ESD |
|
Canvasback Ct. |
Donegal La. |
Federal St. |
|
Fire Dept. |
North Blvd. |
S. Division St. |
|
Franklin Av. |
Northwood Dr. |
S. Park Dr. |
|
Fulton St. |
Oak St. |
S. Park Dr. |
|
Hammond St. |
Oakside Circle |
S. Pinehurst Av. |
|
Hammond St. |
Ohio Av. |
S. Clairmont Dr. |
|
Hammond St. |
Paleo La. |
S. Division St. |
|
Hammond St. |
Park Av. |
Sandy Bottom Ct. |
|
Harrington St. |
Parkwood Dr. |
Saratoga St. |
|
Hasting St. |
Parsons Rd. |
Saratoga St. |
|
High St. |
Pemberton Dr. |
Sharon Dr. |
|
Honeysuckle Dr. |
Poplar Hill |
Shiloh St. |
|
Huston Ter. |
Poplar Hill Av. |
Smith St. |
|
Isabella St. |
Prince St. |
Snow Hill Rd. |
|
Isabella St. |
Prince St. |
Snow Hill Rd. |
|
Lake St. |
Priscilla St. |
South Blvd. |
|
Lemmon Hill |
Pyle St. |
South Blvd. |
|
Light St. |
Pyle St. |
South Blvd. |
|
Locust St. |
Pyle St. |
Spring Av. |
|
Logan St. |
Register St. |
Spring Av. |
|
Lot 10 |
Riverside Dr. |
Springfield Cir. |
|
Lot 30 |
Riverside Dr. |
Terrapin La. |
|
Lot 4 |
Riverside Dr. |
Vine St. |
|
Madison St. |
Riverside Dr. |
W. Main St. |
|
Main St. |
Riverside Rd. |
W. College Av. |
|
Main St. |
Riverview Av. |
W. Locust St. |
|
Marshall St. |
Robert St. |
W. Railroad |
|
Mill St. |
Roger St. |
Walbash St. |
|
Mill St. |
Roger St. |
Washington St. |
|
Monticello Av. |
Roger St |
Washington St. |
|
N. Division St. |
Roland St. |
Wayne St. |
|
N. Park Dr. |
Roland St. |
Woodbrooke Dr. |
|
Naylor Mill Rd. |
Rt. 50 |
|
M. PAVEMENT MARKINGS
|
1. Carroll St. & Waverly Dr. |
6. Main St. & Snow Hill Rd. |
|
2. Glen Av. & Beaglin Park Dr. |
7. N. Park Dr. & Hannibal St. |
|
3. Glen Av. & Beaglin Park Dr. |
8. Pemberton Dr. |
|
4. Hannibal St. & Beaglin Park Dr. |
9. Spring Av. & Snow Hill Rd. |
|
5. Lot 10 |
10. Washington St. & Snow Hill Rd. |
N. LOCATES
1. Preformed Miss Utility locates.
2. Preformed locate at Tennis courts.
O. VEHICLE MAINT.
1. Preformed daily vehicle maintenance.
2. Picked up new trailer from Creighton’s Trailer Sales in Mardela. Turned
paperwork for tags and title to Walt in the garage.
P. REPORTS & MEETINGS
1. Prepared daily and quarterly reports.
2. Staff meetings
3. Town hall meetings
4. PRB meetings
5. Safety review board meetings
Q. MISC.
1. Poplar Hill Mansion- replaced three bulbs.
2. Picked up barricades and cones from Ward Museum
3. Bell Plaza parking lot- trimmed trees
4. Church St. - trimmed trees
5. Trimmed trees at Woodcock playground.
6. Repaired pump on Plaza.
7. Trimmed trees at Woodcock playground.
8. Repaired pump on Plaza.
9. Trimmed trees off Truitt St. for Verizon.
10. Photographs of property near bridge tender house Main St.
11. Trenched for silt fence for Mike the Carpenter for new playground near Bandstand
12. Helped Parks cut down trees at Robins Nest Park
13. Provided temporary service at Lake Street Playground Lake Street
Playground- turned power on to check out electric to new building.
14. Picnic Island- removed overhead cable for tree contractors
15. Took Chanukah Candles to the Plaza
16. Repaired snowflake on Main St.
17. Poplar Hill Mansion- replaced dimmer and light socket.
18. Christmas decorations- turned on time clocks for snowflakes and trees.
R. TRAFFIC STUDIES
1. Roger & Prince Streets
2. Parsons Road & Pemberton Dr.
3. College and Riverside Dr.
4. Isabella and US 50
5. Delaware and Cypress
6. Lake and Mill
7. Isabella and N. Division
8. Isabella at Delaware
9. Isabella at Lake
10. Isabella at Mill
11. Isabella at Division
12. Division St.
S. TRAINING
18. STREET DIVISION
Hotmixing - citywide
Coldmixing - citywide
Patching potholes - citywide
Cleaned catch basins (per plan)
Assisted Sanitation with Bulk Pick-ups on Mondays
Grading Alleys
Top soiling & seeding - citywide.
Set barricades, cones, signs, and cans for organizational functions
Assisted with leaf pickup and recycling
Placed barricades out for the storms
Preparation of streets for repaving
Worked with the County on Lake Street Project
Worked with the Park crew making planters around the City
Got equipment ready for snow removal
19. PARKS
Planted 30 trees citywide parks & playgrounds
Mulched leaves in park
Cleaned drain basins in park areas
Placed Christmas tree downtown for City Hall
Planted planters on Plaza
Two walk-behind snow blowers and one rider ready
Placed playground mulch at Lake St. playground
Removed three dangerous trees from Picnic Island
Removed all trees from Robins Nest Park
Planted 2500 bulbs
Removed over 33 tons of leaves from City streets
20. CARPENTER SHOP
Built shelving unit for City stockroom
Replaced and painted garage door trim at fire station #2
Installed wood sides on parking garage utility trailer
Constructed and painted 50 new barricades for Street Department
Remodeled Recycling Coordinator's office
Started assembly of playground equipment at City Park
21. UTILITIES
Sewer: Second Quarter Totals (October, November, December)
|
New Service |
9 |
|
Renewed Service |
3 |
|
Repaired Service |
10 |
|
Abandoned Service |
6 |
|
Service Stoppages |
61 |
|
Main Stoppages |
34 |
|
Mains Repaired |
2 |
|
Manholes Repaired |
4 |
|
Chemicals |
118 |
|
Miscellaneous Jobs |
0 |
Water: Quarter Totals (October, November, December)
|
New Service |
9 |
|
Renewed Service |
12 |
|
Repaired Service |
4 |
|
Abandoned Service |
6 |
|
Hydrant Repairs |
94 |
|
Fire Services Installed |
3 |
|
Mains Repaired |
2 |
|
Large Meter Replacements |
4 |
|
Valves/Vaults Adjusted |
10 |
|
Miscellaneous Jobs |
0 |
|
Coupon Pits |
7 |
|
Miss Utility Tickets |
927 |
Storm Drains: Quarter Totals (October, November, December)
|
Mains Repaired |
5 |
|
Inlets Rebuilt |
2 |
|
Manholes Rebuilt |
0 |
|
Inlets Repaired |
4 |
|
Main Stoppages |
2 |
|
Inlet Stoppages |
24 |
|
Inlets New |
0 |
|
Miscellaneous Jobs |
0 |
Utility Branch had three vacancies in the second quarter and one to two utility employees assisting meter readers as needed; winterized all playgrounds, fountains, yard hydrants, marina; Lake St. playground (new water/sewer to building)
22. WATER PLANT
Water pumped from: (October, November, December)
|
Main Street Water Plant |
Paleo Water Plant |
Total |
|
|
|
|
|
|
October |
53,537,500 |
132,217,000 |
185,754,500 |
|
November |
42,824,140 |
127,802,000 |
170,626,140 |
|
December |
42,052,440 |
138,197,000 |
180,249,440 |
|
|
|
|
|
|
Totals: |
138,414,080 |
398,216,000 |
536,630,080 |
23. SALISBURY ZOO
Monthly Visitors Count:
October 2003 14,965
November 2003 9,792
December 2003 5,599
Total Visitors count for fiscal year 2004 Second Quarter – 30,356
Total Visitor Count for 2003 – 194,982
Staff: hired Alana Schoedler to fill Education Technician position
Hired Amy Keiser as a temporary zookeeper to cover duty of Jennifer Albero
who is out on 12-week FMLA leave
Staff Projects:
Furthered construction of new river perimeter fence
Continued work for new "Tropics Trail" exhibit
Planned new Education Animal Holding Facility
Master Plan: Continued work in the Master Plan
Events:
Hosted Night of the Living Zoo in October; almost 5,000 in attendance;
brought in nearly $37,000 in total revenue (best ever!)
Hosted Critter Christmas in December; almost 500 in attendance;
brought in nearly $3,000 in total revenue
(RedSwings Playground)
Assisted with planning for renovations to zoo playground with Chris
and Hendrika Layton; playground to be built in memory of Ben Layton
who died of lukemia in 2002
Education Report:
Wicomico County2nd Grade field trips conducted for nearly 600 students
Conducted training for 1 new FTE educator & 3 new PTE educators in December
Trained 3 new members of MD Conservation Corps
Conducted new Forestry Awareness Program in partnership with MD DNR
and MD Conservation Corps
Served 1,300 Wicomico County 4th graders
Docent holiday luncheon December 1, 2003 recognizing volunteer participation
Docent field trip to VA Marine Science Museum on December 5, 2003
50th Anniversary
Continued planning for the 50th anniversary of the Salisbury Zoo in 2004
Over $4,000 received in sponsorships